🎊

Notes from Lean Canvas for Gestalt Asset System

https://leanstack.com/app/mark-mccorkle/projects/517299

Customer Segment

  • hash tag my customer segments in app to separate
  • make them as NARROW as possible
  • early adopters are sub category of narrow segment who have a particular need
  • early adopters are the "easy" group

Problem

  • define early adopter needs specifically
  • 5 Whys — what are the 5 reasons why our early adopters have this problem
image
  • he picked "time consuming, no free time, and lots of external demand.

Existing Alternatives

  • What is the customer doing right now to solve for this problem.
  • Answer could be "nothing", "sending emails", and "using spreadsheets" like NSI disrupts
  • think beyond my direct competitors
Make sure that customer segments→early adopters match up with the 3 top problems and know for certain how they are solving the problem today.

Minimum Success Criteria

  • a smallest outcome that will deem your project a success in less than 3 years from now.
  • make it a revenue goal — yearly preferred
  • make it ballpark — do I want to build a 100,000 dollar business, Million dollar business, etc
  • Example: I want to make a $5M/year revenue business in 3 years.

Unfair Advantage

  • something that cannot be easily copied or bought
  • Gets tested by your competitors.
  • Unfair advantage must be super strong.
  • It is better to leave it blank and figure it out then it is to list a weak one.
  • It is okay to list an unfair advantage that you want to create and not just the ones you have day 0.
image

Channels

  • scaleable path to customers
    • Content Marketing
    • Advertising
    • Sales force
    • Referrals
  • you don't have to have scalable channels day one. Initial Prospects:
    • list of 1 degree contacts
    • asking for introductions
    • email list from teaser page
    • blog readers
    • social network
    • adwords, facebook ads
    • cold call/email
    • sponsor group and events
    • Cost Structure

    • make near term goals and plan cost structure to close ones
      • E.g. Cost to get first 2 GAS Assets onto the asset store
    • Then revisit cost for next goal:
      • Burn rate month to month
      • includes cost to r&d, cost to acquire customer, cost to support live product, hosting costs, tools cost, salary, benefits, taxes